Read CAT’s letter to PennDOT and municipal/regional officials here:
https://lvcat.org/staging/wp-content/uploads/CAT-Hill-to-Hill-bridge-comment-letter-to-PennDOT-6-3-2021.pdf
This letter covers CAT’s emphasis on the importance of 10’ wide sidewalks on both sides of the bridge, as well as improving trail connections on both sides of the river and enhancing pedestrian access/crosswalks from Southside to Main Street and West
Bethlehem neighborhoods.
CAT feels that everyone can experience benefits if the final bridge design reduces vehicle crashes/speeds, tire/engine noise, and delay due to traffic congestion, while improving air quality.
0 Comments